Scope of Work

➢ Design of stormwater drainage

  • For a stockyard with an area of about 30 acres, in which predominantly coal is handled. Also, other dry bulk commodities such as gypsum, limestone, bauxite, manganese ore, coke, etc would be handled.
  • Design of stormwater drainage of the stackyard area along with rail sidings.
  • The stormwater drainage needs to be designed up till the settling pond.

➢ Re-design/plan for effective utilization of settling pond

  • The existing settling pond to be studied and to be re-designed / planned for effective utilization considering the overall discharge and other parameters

➢ Design of Internal Road

  • Design of an internal road within the yard of an area of about 30 acres for heavy truck movement

Project Description 

➢ MVGCB planning to study and carry out rectification and improvement works of the stormwater drainage system and internal roads in their stackyard/s.

 

 


 

 

 

  • Client:VIZAG GENERAL CARGO BERTH PVT. LTD
  • Location:Vizag General Cargo Berth
  • tenure:2023