➢ Kalinga International Coal Terminal Paradip has been developed on a BOT basis Kalinga International Coal Terminal Paradip Private Limited, KICTPPL. The 10 MMTPA capacity terminal has been designed to supply imported coal to the steel plants and thermal power plants. Shosam has carried out the Detailed Design Engineering for the Coal Terminals shall consist of a Berth, Stack Yard, Conveyor System, buildings, and Rail load system.

Project Description 

➢ The Project consists of a Berth for handling vessels up till 150,000mT. The coal stackyard with Capacity of 180,000 mT. Two Ship Unloader, Three number Stacker cum Reclaimers with a Stacking capacity of 5,500 TPH and Reclaiming capacity of 4,500 TPH has been provided along with a Dust suppression system.
 

  • Client:Paradip Port Trust (PPT) / KICTPPL and / ISGEC Heavy Engineering
  • Location:Paradip Port
  • tenure:2018-2021