➢ Jetty Works
➢ Reclamation works.
➢ Shore Protection Works.
➢ Rail Over Bridge, Roads and Water Supply & Electricity Works.
➢ Preparation of Design Basis Memorandum.
➢ Preliminary offshore pipeline routing from SPM and Sea Island to landfall point.
➢ Concept-level pipeline sizing.
➢ Conceptual offshore pipeline design including Raiser.
➢ Capex and Opex cost estimate for offshore pipeline system.
➢ Preparation and Submission of Feasibility Report by compiling the above.